Optional services
Optional services
Delivered by experienced, certified engineers, HPE support services help you keep your servers up and running with support packages
tailored specifically for HPE ProLiant systems. HPE support services let you integrate both hardware and software support into a single
package. A number of service level options are available to meet your business and IT needs.
HPE support services offer upgraded service levels to expand the standard product warranty with easy
‑
to
‑
buy, easy
‑
to
‑
use support
packages that will help you make the most of your server investments. Some of the HPE support services for hardware, software, or
both are:
Foundation Care – Keep systems running.
The time commitment for this service might vary depending on the site's geographical region. For more service information
available at your site, contact your local HPE support center
Deployment service for both hardware and software.
HPE Education Services – Help train your IT staff.
For more information on HPE support services, see the HPE Pointnext website:
Optional services
56
Содержание ProLiant DL360 Gen10 Plus
Страница 8: ...Component identification Component identification 8...
Страница 24: ...DIMM slot locations DIMM slots are numbered sequentially 1 through 16 for each processor DIMM slot locations 24...
Страница 29: ...HPE Basic Drive LED definitions 29...
Страница 31: ...BIOS Platform Configuration RBSU Hot plug fans 31...
Страница 36: ...Operations Operations 36...
Страница 47: ...Remove the secondary PCI riser cage 47...
Страница 54: ...Accessing the Systems Insight Display 54...
Страница 55: ...Setup Setup 55...
Страница 73: ...Hardware options installation Hardware options installation 73...
Страница 108: ...Installing an 8SFF optical drive 108...
Страница 110: ...8 Route and connect the data cable 9 Route and connect the power cable Installing a 2SFF SAS SATA NVMe drive cage 110...
Страница 122: ...Secondary PCI riser options Secondary PCI riser options 122...
Страница 129: ...Full length Installing an expansion board in the secondary riser cage 129...
Страница 135: ...Installing a type a Smart Array storage controller option 135...
Страница 140: ...Processor and heatsink options Processor and heatsink options 140...
Страница 149: ...4 LFF 11 Connect the cable Installing the Systems Insight Display power module 149...
Страница 160: ...HPE Trusted Platform Module 2 0 Gen10 option HPE Trusted Platform Module 2 0 Gen10 option 160...
Страница 163: ...Installing and enabling the HPE TPM 2 0 Gen10 option Installing and enabling the HPE TPM 2 0 Gen10 option 163...
Страница 164: ...Installing the Trusted Platform Module board Installing the Trusted Platform Module board 164...
Страница 167: ...4 Proceed to Preparing the server for operation Installing the TPM board and cover 167...
Страница 173: ...Cabling Cabling 173...
Страница 177: ...Front power SID USB cabling Front I O cabling 177...
Страница 178: ...Storage cabling Storage cabling 178...
Страница 181: ...8SFF x4 2SFF backplanes to type p controller 8SFF x4 2SFF backplanes to type p controller 181...
Страница 182: ...8SFF x4 2SFF backplanes to type a and type p controllers 8SFF x4 2SFF backplanes to type a and type p controllers 182...
Страница 183: ...2SFF x4 backplane to primary NVMe riser 2SFF x4 backplane to primary NVMe riser 183...
Страница 186: ...8SFF x4 backplane to 2 port type p controller 8SFF x4 backplane to 2 port type p controller 186...
Страница 187: ...8SFF x4 backplane direct attach 8SFF x4 backplane direct attach 187...
Страница 188: ...8SFF SAS SATA backplane to embedded SATA 8SFF SAS SATA backplane to embedded SATA 188...
Страница 191: ...4LFF backplane to controllers 191...
Страница 192: ...Software and configuration utilities Software and configuration utilities 192...
Страница 221: ...Keeping the system current Keeping the system current 221...
Страница 234: ...Troubleshooting Troubleshooting 234...
Страница 238: ...Removing and replacing the system battery 238...
Страница 251: ...Support and other resources Support and other resources 251...