3.
Install the drive.
4.
Determine the status of the drive from the drive LED definitions (
Hot-plug drive LED definitions
8).
Installing an NVMe drive
CAUTION:
To prevent improper cooling and thermal damage, do not operate the server unless all drive
and device bays are populated with either a component or a blank.
Procedure
1.
Remove the drive blank.
2.
Prepare the drive.
Hardware options installation
25
Содержание HPE ProLiant XL230k Gen10
Страница 10: ...Chassis server bay numbering Chassis I O module bay numbering 10 Component identification...
Страница 43: ...4 Install the riser cover 5 Install the riser into the I O module Hardware options installation 43...
Страница 58: ...Cabling Front panel LED board assembly cabling SATA drive cabling 58 Cabling...