16. Install the air baffle
17. Install the access panel.
18. Install the server into the rack.
19. Connect each power cord to the server.
20. Connect each power cord to the power source.
21. Power up the server.
Removing and replacing an energy pack
Procedure
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Do one of the following:
•
Extend the server from the rack.
•
Remove the server from the rack.
5. Do one of the following:
•
•
Remove the 4 LFF midplane cage.
Removal and replacement procedures
95
Содержание HPE ProLiant DL385 Gen10 Plus
Страница 37: ...Customer self repair 37...
Страница 38: ...Customer self repair 38...
Страница 39: ...Customer self repair 39...
Страница 137: ...Item Description 1 Box 4 2 Box 5 Midplane box LFF Item Description 1 Box 7 Component identification 137...
Страница 142: ...12 LFF front panel Midplane box LFF Midplane box SFF Component identification 142...
Страница 154: ...Cable routing 8 LFF front I O module to SATA Port Cable routing Universal Media Bay to SATA Port Cabling 154...
Страница 164: ...Cable routing 8 LFF front I O module display port to system board Cable routing Display port to system board Cabling 164...
Страница 168: ...Cable routing Rear 2 SFF riser power cable Cabling 168...