12. Install the air baffle.
13. Install the access panel.
14. Install the server into rack.
15. Connect each power cord to the server.
16. Connect each power cord to the power source.
17. Power up the server.
Removing and replacing a processor
Hewlett Packard Enterprise recommends
identifying the processor and socket components before performing this
procedure.
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
• T-20 Torx screwdriver
• 1.0 gm (0.5 ml) or two 0.5 gm (0.25 ml) of thermal grease
• Alcohol wipe
Procedure
1.
Observe the following alerts.
CAUTION: To avoid damage to the processor or system board, only authorized personnel should attempt to
replace or install the processor in this server.
CAUTION: To prevent possible server malfunction and damage to the equipment, multiprocessor configurations
must contain processors with the same part number.
Removal and replacement procedures
90
Содержание HPE ProLiant DL385 Gen10 Plus
Страница 37: ...Customer self repair 37...
Страница 38: ...Customer self repair 38...
Страница 39: ...Customer self repair 39...
Страница 137: ...Item Description 1 Box 4 2 Box 5 Midplane box LFF Item Description 1 Box 7 Component identification 137...
Страница 142: ...12 LFF front panel Midplane box LFF Midplane box SFF Component identification 142...
Страница 154: ...Cable routing 8 LFF front I O module to SATA Port Cable routing Universal Media Bay to SATA Port Cabling 154...
Страница 164: ...Cable routing 8 LFF front I O module display port to system board Cable routing Display port to system board Cabling 164...
Страница 168: ...Cable routing Rear 2 SFF riser power cable Cabling 168...