
Technical white paper
Page 33
Dismounting an Infrastructure Rack from a shock pallet
To dismount the rack, reverse the process for assembling the shock pallet. Figure 27 illustrates the dismounting process for an Infrastructure
Rack.
Figure 27.
Infrastructure Rack dismounting steps
Installation service
In the U.S., HPE can arrange to have your rack installed by qualified service providers. This installation service covers the entire hardware
installation sequence, from unpacking the components to routing cabling and running a test of the systems. Installation can also be provided
directly by HPE authorized service providers.
If you need a pre-certified solution, contact the high-performance technical computing (HPC) solutions group at
hpe.com/us/en/servers/apollo.html.
Spares kits
Contact your local reseller or the HPE Parts Store for information on spares kits at: parts.hpe.comh.
Additional tools and equipment
•
11/16 in (or 17mm) open-end wrench
•
9/16 in (or 14mm) open-end wrench or socket
•
7/16 in (or 11mm) open-end wrench or socket
•
8/16 in (or 12mm) open-end wrench or socket
•
Stretch wrap
•
Banding