11
The safety checks described in the following
paragraphs must be completed before the radio remote
control system is activated. These checks must be
performed at least once a day, before the start of any
operation and at all shift changes.
IMPORTANT:
A transmitter drawing is included with
each system. Transmitter layout and inscriptions may
vary according to customer requests.
VISUAL CHECK
Always check the transmitter for any physical damage
before any operation.
•
Always keep crane/machine safety features,
guards and controls in good repair, in place and
securely fastened.
•
Check crane/machine and radio remote control
system for wear or damage.
•
Check rubber cuffs for wear or damage.
IMPORTANT:
Never operate a transmitter with worn or
damaged parts. Replace immediately with only
Hetronic parts. Contact Hetronic or your Dealer.
START-UP PROCEDURE
This procedure must be carefully followed before
beginning any operation.
1. Be sure that all safety measures required by the
equipment manufacturer have been followed.
2. Be sure that all controls are in the Off (neutral)
position.
3. Push in the transmitter E-stop pushbutton.
4. Be sure that the transmitter batteries are fully
charged and inserted into the transmitter handle.
If any control is NOT in the Off (neutral) position
when the battery is inserted, the transmitter will
not turn on. The LED on the transmitter will turn
red.
5. Disengage the E-stop pushbutton.
6. Check that the crane/machine functions
correspond with the transmitter functions.
IMPORTANT:
The crane/machine functions will
operate during this check. Be certain that there are no
obstacles near the crane/machine.
7. Push the "E-STOP" pushbutton on the
transmitter. Be sure that no functions can be
activated with the "E-STOP" pushbutton
depressed.
OPERATION
WARNING:
FAILURE TO FOLLOW
INSTRUCTIONS could result in personal
injury and/or damage to equipment. Read and
understand the safety instructions in all
manuals provided.
WARNING:
FAILURE TO FOLLOW
INSTRUCTIONS could result in personal
injury and/or damage to equipment. Test the
"E-STOP" function as described in the
crane/machine manufacturer’s operator
manual before beginning any operation.
1. Emergency stop button
2. Toggle switch S1 to S6 with function (T-0-T). Up
to 7 toggle switches possible according to
version (see Transmitter and receiver drawings).
3. Battery compartment / handle
4. Proportional trigger switch
5. Battery tube
6. Battery tube release lever
1
2
3
4
5
6
PRELIMINAR
Y COPY