MAINTENANCE SCHEDULE
(Some points have also been prescribed in accordance with TGPF 118 H!)-
For safety reasons, maintenance must only be carried out with the main switch
turned off. However, first of all, the system must be switched off by means of
the On/Off button and you must wait for the burnout phase. If you have to climb
into the storage tank or bunker, always make sure that there is a second person
available to supervise you.
Potential carbon monoxide enrichment may put your life in danger.
11.1
Weekly Inspection
Item
Procedure
Total system
Check the whole boiler system (1)
including the fuel storage room (2)
visually for damages and wear. Repair
discovered faults immediately.
11.2
Monthly inspection, at least every 1000 operating hours
Item
Procedure
Pivoting grate
Burning chamber
Dismantle or open burning
chamber door (1)
Check burning chamber stones and walls
visually for damages and wear and
conduct cleaning with scraper and broom
(2), afterwards remove ash off burning
chamber. Check and clean burning
chamber vents (3)
2
3
1
1
2
Содержание pelletstar CONDENSATION 10
Страница 1: ...OPERATING INSTRUCTIONS Pellet boiler pelletstar CONDENSATION 10 60 ...
Страница 20: ...8 Temperature manager 20 Fig 8 6 Example temperature manager when time mode without difference ...
Страница 85: ...Annex 15 85 15 ANNEX 15 1 Additional boiler schematic visualization Hydraulic recommendation 1 ...
Страница 86: ...15 Annex 86 Hydraulic recommendation 2 ...
Страница 87: ...Annex 15 87 15 2 Solar module schematic representation Program 1 ...
Страница 88: ...15 Annex 88 Program 2 ...
Страница 89: ...Annex 15 89 Program 3 ...
Страница 90: ...15 Annex 90 Program 4 ...
Страница 91: ...Annex 15 91 Program 5 ...
Страница 92: ...15 Annex 92 Program 6 ...
Страница 93: ...Notes 16 93 16 NOTES ...