13
Maintenance schedule (Customer inspection)
78
Betriebsanleitung_pelletfire_Touch_Englisch_V1.2
13.2
Monthly (after 1000 hours)
Equipment area
Action
Heat recovery
areas
Cleaning of the heat recovery areas:
The heat exchanger pipes are to be
checked regularly for soiling and should
be
cleaned
manually
if
required
(Cleaning interval after 1000h, show on
display). Rust and fly ash deposits on the
heat recovery areas (16) have a
considerable effect on the economy and
performance of the boiler.
(1) Removing the upper boiler casing
(2) Loosening screw caps and removing
cleaning cover (12)
Heat recovery
areas
(3) Loosening
the
fixture
of
the
turbulators
(4) Removing
and
cleaning
of
turbulators (13)
1
2
3
4
Содержание pelletfire
Страница 1: ...Operating instructions Log Wood Pellet heatingsystem pelletfire 20 40 ...
Страница 86: ...16 Annex 86 Betriebsanleitung_pelletfire_Touch_Englisch_V1 2 Hydraulic recommendation 2 ...
Страница 87: ...Annex 16 Betriebsanleitung_pelletfire_Touch_Englisch_V1 2 87 16 2 Solar module Program 1 ...
Страница 88: ...16 Annex 88 Betriebsanleitung_pelletfire_Touch_Englisch_V1 2 Program 2 ...
Страница 89: ...Annex 16 Betriebsanleitung_pelletfire_Touch_Englisch_V1 2 89 Program 3 ...
Страница 90: ...16 Annex 90 Betriebsanleitung_pelletfire_Touch_Englisch_V1 2 Program 4 ...
Страница 91: ...Annex 16 Betriebsanleitung_pelletfire_Touch_Englisch_V1 2 91 Program 5 ...
Страница 92: ...16 Annex 92 Betriebsanleitung_pelletfire_Touch_Englisch_V1 2 Program 6 ...
Страница 93: ...Notes 17 Betriebsanleitung_pelletfire_Touch_Englisch_V1 2 93 17 NOTES ...
Страница 94: ...17 Notes 94 Betriebsanleitung_pelletfire_Touch_Englisch_V1 2 ...
Страница 95: ...Notes 17 Betriebsanleitung_pelletfire_Touch_Englisch_V1 2 95 ...