![HEROSE 0125 Series Скачать руководство пользователя страница 16](http://html.mh-extra.com/html/herose/0125-series/0125-series_operating-instructions-manual_2126780016.webp)
Operating instructions
12
Phone +49 4531 509-0
Assembly sequence for the bolts
Nominal
size
RB-
bonnet/
RB-body
[Nm]
RB-
bonnet/
SS-body
[Nm]
SS-
bonnet/
SS-
body
[Nm]
Cap bolt
DN 10
19
19
25
30
M8
DN 15
19
19
25
30
M8
DN 20
37
44
50
M10
DN 25
37
44
50
M10
DN 32
41
45
50
M10
DN 40
51
60
70
M12
DN 50
49
50
50
M10
DN 65
-
80
90
M12
DN 80
-
90
110
M16
DN 100
-
110
130
M16
DN 150
-
130
130
M16
DN 200
-
-
130
M24
Bonnet / body tightening torques
RB-bonnet
≙
Red brass bonnet
RB-body
≙
Red brass body
SS-bonnet
≙
Stainless steel bonnet
SS-body
≙
Stainless steel body
Check the leak-tightness
6
Operation
6.1
Prior to start-up
Check the following points prior to start-up:
All mounting and installation work are completed.
If fitted: The blocking bushing was removed prior to start-up.
The safety guards are in place.
Compare the material, pressure, temperature and installation position with the layout plan for
the pipework system.
Remove dirt and residues from the pipeline and globe valve in order to prevent leaks.
Содержание 0125 Series
Страница 1: ...HEROSE GMBH ARMATUREN UND METALLE Operating instructions Cryogenic globe valves ...
Страница 2: ......