43
1
18
8))
Thoroughly dry the vat with a towel, and then press “✓” button. Controls return
to normal operations.
1
19
9))
Make sure drain is closed.
M
Ma
akke
e ssu
urre
e tth
he
e iin
nssiid
de
e o
off tth
he
e vva
att,, tth
he
e d
drra
aiin
n vva
allvve
e o
op
pe
en
niin
ng
g,,
a
an
nd
d a
allll tth
he
e p
pa
arrttss tth
ha
att cco
om
me
e iin
n cco
on
ntta
acctt w
wiitth
h tth
he
e n
ne
ew
w o
oiill a
arre
e
a
ass d
drryy a
ass p
po
ossssiib
blle
e..
2
20
0))
Clean and thoroughly dry the filter pan assembly and return, with new filter pad,
to the fryer. Fill vat with oil following the instructions from
3
3..1
16
6 C
Co
olld
d S
So
oa
akk P
Prro
occe
ed
du
urre
e
1
1))
Dispose of the oil in the fryer.
2
2))
Fill the fryer with cleaning solution and let it sit overnight.
3
3))
Use the long-handled fryer brush or a blue scouring pad in an up and down
motion (scour the sides of the kettle and the heating coils).
4
4))
Use the L-shaped brush to scrub between the heating coils and the sides of the
fryer kettle.
5
5))
Place a three-gallon clear plastic bucket or a full sized meat pan under the drain
valve.
6
6))
Use step 4 in the filter menu to drain the cold soak cleaning solution into the
bucket or pan. NOTE: Use the salad cart to transport the bucket or pan if
necessary.
7
7))
Discard the cold soak cleaning solution in the mop sink.
C
Ca
allll o
ou
utt ““h
ho
ott w
wa
atte
err”” w
wh
he
en
n cca
arrrryyiin
ng
g h
ho
ott w
wa
atte
err tto
o tth
he
e ffrryye
errss..
F
Fa
aiillu
urre
e tto
o d
do
o sso
o m
ma
ayy rre
essu
ulltt iin
n m
miin
no
orr b
bu
urrn
nss..
8
8))
Fill the double boiler bottom half full with hot tap water.
9
9))
Carefully pour the water into the fryer. NOTE: Use the salad cart for multiple
trips with hot water.
1
10
0))
Repeat this procedure two or more times for the rinse water to reach the fryer’s
fill line.
1
11
1))
Place a three-gallon clear plastic bucket or a full sized meat pan under the drain
valve.
1
12
2))
Use step 4 in the filter menu to drain the hot water into the bucket or pan.
3
3..1
17
7 C
Ch
he
ecckk//R
Re
ep
plla
acce
e D
Drra
aiin
n P
Pa
an
n O
O--R
Riin
ng
gss
To prevent oil leaking, and to keep filtering process operating properly, the filter drain
pan O-rings should be inspected for nicks and tears at least every 3 months.
Содержание Wendy's Evolution Elite EEG-251
Страница 2: ......
Страница 5: ...Contents iii...
Страница 14: ...Introduction 2...
Страница 19: ...Installation 7 Figure 2 1 Flexible Gas Line Cable Restraint Installation...
Страница 22: ...Figure 2 2 1 Well Dimensions Figure 2 3 2 Well Dimensions Installation 10...
Страница 23: ...Figure 2 4 3 Well Dimensions Figure 2 5 4 Well Dimensions Installation 11...
Страница 24: ...Installation 12...
Страница 51: ...Operation 37...
Страница 62: ...Operation 48...
Страница 68: ...Information Mode 54...
Страница 72: ...Product Program Mode 58...
Страница 87: ...Troubleshooting 73...
Страница 88: ...Troubleshooting 74...
Страница 89: ...blank page...