background image

YUNBA H99X1 SMART IRONING STEAM GENERATOR

INSTRUCTIONS

SHENZHEN HANMINGWEI SMART EQUIPMENT CO., LTD

Add:

Building 3B, 8 Cichang Road, Henggang, Longgang District, Shenzhen 

Tell:0755-8467 9158     Fax:0755-2377 3276  

[email protected]

Содержание YUNBA H99X1

Страница 1: ... SMART IRONING STEAM GENERATOR INSTRUCTIONS SHENZHEN HANMINGWEI SMART EQUIPMENT CO LTD Add Building 3B 8 Cichang Road Henggang Longgang District Shenzhen Tell 0755 8467 9158 Fax 0755 2377 3276 hemway hemway com cn ...

Страница 2: ... notice Check out our website at anytime http www hemway com cn The product works under high temperature and high pressure environment Non professional maintenance personnel are not allowed to disassemble the product without permission Please refer to our warranty card for warranty Outside the warranty period we also provide services If you need to replace the parts we will charge a certain amount...

Страница 3: ...ligent scale removal At the same time it has the characteristics of adjustable pressure intelligent dormancy and fault code reminder The steam capacity of the product is sufficient to meet the requirements of small ironing medium ironing big steam ironing and other industries This product is suitable for all kinds of clothing factories clothing finishing centers home textile stores curtain stores lau...

Страница 4: ...ater return pipe 11 IronⅠ 12 IronⅡ 13 Wheel brake 18 19 17 16 16 Water tank 17 Water level detector signal line 18 Condensate pipe 19 pump inlet pipe 15 Water source inlet 15 14 Water tank top cover 21 drainage pipe 20 power cable 14 1 Host BACK ...

Страница 5: ... Standards Power short Circuit Protection Installation Instructions Tip Disconnect the power supply and turn off the steam control switch before installation Power cable Load Standard AC380V three phase electric power supply line reference one set two sets three sets four sets five sets one set two sets three sets four sets five sets within 10 meters more then 10 meters RVV5 4 0mm RVV5 6 0mm RVV5 10 ...

Страница 6: ...pe and water return pipe of the iron on the corresponding wiring port Steam pipe joint and Water return pipe joint and lock them tightly Disclaimer Hemway will not be responsible for any consequences arising from the failure to operate as required Figure 4 Water tank installation As shown in Figure 3 use 4 M 4 x 8 screws to fix the fixing bar on the upper back of the water tank paying attention to t...

Страница 7: ...lation Connect the water inlet connector to the water inlet main pipe Connect the drainage pipe to the drainage main pipe Recommend Installation Method Drainage Pipeline Standard Device Quantity three sets five sets ten sets 3 4 1 1 5 Pipe Recommend Material 304 stainless steel pipe Op tional Material galvanized pipe PPR pipe Tip Always use soft water and water pressure limition 1 3Kg cm2 Put the w...

Страница 8: ...s normal phenomenon NOTE Main drainage pipe Connect the main drainage pipe Main drainage pipe Connect the drainage head and put into the drainage container 四 MAINTENANCE ITEM CONTENT FREQUENCY draining after off work Daily Monthly Monthly Monthly Weekly Every Six month Drainage Drainage pipe Deeply Descaling Heat emission Holes Circuit Water tank clean check the drainage pipe joints and tighten it ...

Страница 9: ...rd Check the water level line and water level grounding port 六 AFTER SERVICE If you have any quality problems or other problems after purchase Hemway products please contact the local distribut or hemway hemway com cn for consultation To apply for a warranty must be in accordance with the below conditions 1 Please operate the machine strictly according to the manual when it is first started up and ...

Отзывы: