![Helmholz TB20 Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/helmholz/tb20/tb20_manual_2122257017.webp)
TB20, strain gauge weighing module | Edition 1 | 21.12.2018
17
3
Installation and removal
TB20 modules can carry lethal voltage.
Before starting any work on TB20 system components, make sure to de-energize all components and the
cables supplying them with power! During work when the system is live, there is the risk of fatal
electrocution!
Installation must be carried out according to VDE 0100/IEC 364 or in accordance with applicable
national standards. The TB20 IO system has protection rating IP20. If a higher protection rating is
required, the system must be installed in a housing or control cabinet. In order to ensure safe operation,
the ambient temperature must not exceed 60 °C.
3.1
Installation position
The TB20 I/O system can be installed in any position.
In order to achieve optimum ventilation and be able to use the system at the specified maximum
ambient temperature, it will, however, be necessary to use a horizontal installation layout.
3.2
Minimum clearance
It is recommended to adhere to the minimum clearances specified when installing the coupler and
modules. Adhering to these minimum clearances will ensure that:
The modules can be installed and removed without having to remove any other system
components
There will be enough space to make connections to all existing terminals and contacts using
standard accessories
There will be enough space for cable management systems (if needed)
The minimum clearances for mounting TB20 components are: 30 mm on the top and on bottom and
10 mm on each side.