Helmer Scientific i.Series
®
and Horizon Series
™
Freezer - Undercounter
Operation Manual
360376/C
8
3 i.Series
®
Operation
3.1
Initial Start Up
1.
Plug the power cord into a grounded outlet that meets the electrical requirements on the product specification label.
2. Switch AC ON/OFF switch ON.
3.
Switch back-up battery switch ON.
Notes
•
For models equipped with optional Access Control, the back-up battery is turned ON with a key switch.
• The Start screen is displayed when the i.C
3
is powered on. The i.C
3
will take approximately 2-5 minutes to boot up.
Start screen
The language screen is displayed when the i.C
3
is powered on. Use the Language screen to select the i.C
3
display language.
Language screens
Note
English is the default language.
i.Series Operation