Installation
Convectron
®
ATM Vacuum Gauge Module Instruction Manual
9
Be
for
e
You Beg
in
In
stallation
A
na
log O
per
atio
n
R
S–48
5 Op
er
ation
M
ain
te
n
a
n
ce
Step 3
Attach module to vacuum chamber
Attach the module vacuum chamber fitting to its mate on the vacuum
chamber.
1/8 NPT pipe thread
The 1/8 NPT pipe thread accommodates a standard 1/8 NPT female fitting.
a.
Wrap the threads of the port to the vacuum chamber with Teflon
®
tape.
b.
Without using a wrench or other tool, tighten the module just enough
to achieve a seal.
VCR type fitting
a.
Remove the plastic or metal bead protector cap from the fitting.
b.
If a gasket is used, place the gasket into the female nut.
c.
Assemble the components and tighten them to finger-tight.
d.
While holding a back-up wrench stationary, tighten the female nut 1/8
turn past finger-tight on 316 stainless steel or nickel gaskets, or 1/4 turn
past finger-tight on copper or aluminum gaskets.
KF flange
The KF mounting system requires O-rings and centering rings between
mating flanges.
a.
Tighten the clamp wing nut to compress the mating flanges together.
b.
Seal the O-ring.
ConFlat flange
To minimize the possibility of leaks with ConFlat flanges, use high strength
stainless steel bolts and a new, clean OFHC copper gasket. Avoid
scratching the seal surfaces. To avoid contamination, install metal gaskets.
a.
Finger tighten all bolts.
b.
Use a wrench to continue tightening 1/8 turn at a time in crisscross
order (1, 4, 2, 5, 3, 6) until flange faces make contact.
c.
Further tighten each bolt about 1/16 turn.
Содержание GRANVILLE-PHILLIPS Convectron ATM
Страница 2: ......
Страница 4: ......
Страница 8: ...iv Convectron ATM Vacuum Gauge Module Instruction Manual ...
Страница 12: ...4 Convectron ATM Vacuum Gauge Module Instruction Manual ...
Страница 80: ...72 Convectron ATM Vacuum Gauge Module Instruction Manual ...
Страница 90: ...82 Convectron ATM Vacuum Gauge Module Instruction Manual ...
Страница 97: ......