11 Commissioning and acceptance
11.6 Maintenance
The maintenance of the hold-open system must comprise the elements of a functional test and,
additionally, the following elements:
a) Check for compliance with the documentation and the general building type approval;
b) Cleaning of the functionally relevant components of the hold-open system, as far as
contamiation can lead to impairment;
c) Preventive replacement of components of the hold-open system according to the
manufacturer’s specifications (e. g. fire detectors, accumulators and/or batteries);
d) Check whether the hold-open system is triggered in the event of a power failure;
e) Check whether the hold-open system triggers in case a fire detector is removed.
11.7 Obligatory documentation requirement
The functional tests that have been carried out must be documented (scope, result and date/time)
and made available for the owner/operator.
For documenting the test and maintenance, we offer a commissioning and maintenance set (IW Set
RS, part no. 7001949) which meets the requirements of DIBt and DIN 14677.