![Hekatron FSZ Pro Скачать руководство пользователя страница 37](http://html1.mh-extra.com/html/hekatron/fsz-pro/fsz-pro_instruction-manual_2120416037.webp)
37
11 Commissioning and acceptance
After successful acceptance testing, a 105 mm x 52 mm sign with the inscription
hold-open system
general building type-approval number
acceptance by ....
(Company logo as well as month and year of acceptance)
to be supplied by the applicant for this general design approval shall be affixed to the wall by the
operator in the immediate vicinity of the closure, permanently.
HEKATRON Vertriebs GmbH
Postfach 1040
D-79296 Sulzburg
(0 76 34) 5 00-2 64
FAX (0 76 34) 5 00-3 23
&
Abnahme durch:
(Firmenzeichen sowie Monat und Jahr der Abnahme)
Feststellanlage
Fig . 14:
A certificate of successful acceptance testing shall be issued to the operator; it shall be kept by the
operator.
11.2 Maintenance instructions
The applicant for the general building type approval must ensure that written maintenance
instructions are included in the delivery of the respective design variant of the hold-open system
(according to the devices and device combinations used). The maintenance instructions must clearly
specify the activities to be carried out to ensure that the built-in hold-open system fulfils its tasks
even after a long periodof use.
Содержание FSZ Pro
Страница 2: ...2...
Страница 44: ...44...
Страница 45: ...45 128 128 36 36 8 Bohrschablone Textanker...
Страница 46: ...46...
Страница 47: ...47...