HEITECH RD1-835CW Скачать руководство пользователя страница 7

A

B

B

A

screed

water connection

discharge

-7-

level tiled floor

level tiled floor 
at Recoh-drain

level tiled floor

level tiled floor 
at Recoh-drain

screed

earth connection

5.3  Connect discharge and waterconnections

Cross section A-A

Cross section B-B

Содержание RD1-835CW

Страница 1: ...se for some time Using a thermostatic mixer tap is therefore recommendable When using the Recoh drain the tap limit of the hot water preparer must be taken into account It is possible the necessary en...

Страница 2: ...nto contact with water have been made of copper or brass The heat Floor and wall heating Assuming a maximum temperature of 50 C water in the floor heating system there must be at least 100 mm distance...

Страница 3: ...oss section A A A A RVS gutterframe 50 mm discharge 2 Units Unit 1 3 Screed mould template heat exchanger Topview Unit 2 grate siphon gutter hair stopper rubber seal 2 Overview of components of the Re...

Страница 4: ...by using System A 3 Installation System B boiler Discharge tap water supply mixer tap Recoh drain preheated tap water boiler Discharge tap water supply mixer tap System A Recoh drain preheated tap wat...

Страница 5: ...B A mould discharge 50mm 60 90 o 5 5 Installing unit 1 5 1 Gap in concrete floor level tiled floor level tiled floor at Recoh drain Cross section A A level tiled floor at Recoh drain level tiled floo...

Страница 6: ...tiled floor level tiled floor at Recoh drain 200 quick set mortar K70 level horizontal 6 earth connection A 5 2 Mounting unit 1 Cross section A A level tiled floor at Recoh drain level tiled floor Cro...

Страница 7: ...nection discharge 7 level tiled floor level tiled floor at Recoh drain level tiled floor level tiled floor at Recoh drain screed earth connection 5 3 Connect discharge and waterconnections Cross secti...

Страница 8: ...membrane After applying the tiles kit the gutter frame all around Before kit Primer frame en edges of tiles to achieve a good connection or 2 component kit We recommend to apply level tiled floor Gra...

Страница 9: ...nect leakage tube 9 connect sliding sleeve 6 1 Place Recoh drain heatexchanger 6 Installing unit 2 Cross section A A Cross section B B Connect the clips at the sides behind the gutter frame locking cl...

Страница 10: ...10 flexible tube 1 2 female 6 2 Conect fresh water connections Cross section A A Cross section B B...

Страница 11: ...pointed downwards Cross section A A Cross section B B Rubber seal Press firmly from the center to the sides Note Don t push the rubber seal to deep upper side equal to top siphon gutter Prevent closin...

Отзывы: