
Commissioning | Configuring the axes
7.6.8
Activating the reference mark search
The product uses the reference marks to reference the machine table to the
machine, for example. If the reference mark search has been activated, a wizard
appears on startup of the product and asks the user to move the axes for the
reference mark search.
Requirement:
The installed encoders have reference marks that have been
configured in the axis parameters.
The reference mark search does not need to be performed for serial
encoders with EnDat interface, because the axes are automatically
homed.
The automatic reference mark search on startup of the product can be
canceled depending on the configuration.
"Reference marks (Encoder)", Page 201
Tap
Settings
in the main menu
Tap
Axes
Open in the sequence
General settings
Reference marks
Activate
Reference mark search after unit start
with the
ON/OFF
slide switch
The reference marks must be traversed every time the
product is started
The functions of the product will only be available after the
reference mark search has been completed
The Reference symbol stops blinking upon successful
completion of the reference mark search
"Operating elements of the position
7.7
OEM area
In the
OEM area
, commissioning engineers can customize the product in various
ways:
Documentation
: Adding the OEM documentation, e.g. service information
Startup screen
: Defining a startup screen with the OEM's company logo
Screenshots
: Configuring the unit for screenshots with the program Screen-
shotClient
7
HEIDENHAIN | GAGE-CHEK 2000 | Operating Instructions | 08/2020
113
Содержание GAGE-CHEK 2000 Series
Страница 1: ...GAGE CHEK 2000 Operating Instructions Evaluation Unit English en 08 2020 ...
Страница 12: ......
Страница 13: ...1 Fundamentals ...
Страница 22: ......
Страница 23: ...2 Safety ...
Страница 28: ......
Страница 29: ...3 Transport and storage ...
Страница 34: ......
Страница 35: ...4 Mounting ...
Страница 41: ...5 Installation ...
Страница 51: ...6 Basic operation ...
Страница 74: ......
Страница 75: ...7 Commissioning ...
Страница 119: ...8 Setup ...
Страница 154: ......
Страница 155: ...9 Measuring ...
Страница 169: ...10 File management ...
Страница 176: ......
Страница 177: ...11 Settings ...
Страница 210: ......
Страница 211: ...12 Servicing and maintenance ...
Страница 220: ......
Страница 221: ...13 What to do if ...
Страница 225: ...14 Removal and disposal ...
Страница 227: ...15 Specifications ...