
STEP 2
Handle Assembly
STEP 3
Legs & Handle Assembly
STEP 4
Mat Assembly
1
1
1
2
3
4
5
4
3
Threading - Mat
Starting at one corner, thread the elastic cord around the legs and up through two mat eyelets as shown, ensuring that
both lengths of the elastic cord are of equal length.
Please note that two adults may be required to pull the elastic cord around the trampoline frame.
First Corner
Start threading elastic cord to frame,
ensuring the elastic cord is as tight
as possible.
Middle Changeover
Change threading pattern after eyelet 2 by
taking the elastic cord around the leg tube
and pushing it down through eyelet 3 and
around leg tube. Repeat until side is threaded.
Second Corner
When eyelet 5 is reached thread
the elastic cord around the corner
as shown and repeat until remaining
three sides are threaded.
Hooking The Elastic Cord
A. When both ends of the elastic cord have threaded the last eyelet, push the flexible plastic sleeve over the end
and thread the metal hook through the eyelet in the elastic cord.
B. Wrap it around 2 times with the hook facing inwards and positioned underneathe the mat.
C. Hook on the other side of the elastic cord and cover the joint with the plastic sleeve.
D. For safety reasons, the elastic cord must be wrapped around the final leg two times.
Please take care when hooking the elastic cord around the final leg of the frame, as tension in the elastic cord will be high.
6
7
5
7
6
Long Bolt x 4
Leg
Handle
Leg
F2
F2
2
1
2
Short Bolt x 4
F1
F1
2
2
2
8
9
Spanner x 1
Allen Key x 1
STEP 1
Leg Assembly
Ensure both spring clips lock
into place when you fit poles
1 and 5 together
Spring Clip
Spring Clip
5
Clip facing inwards