background image

 10 

Revised 2017 

Disassembling the Unit: 

1. Turn off power and remove all power from machine and follow all local 

safety procedures.  

2. On the 107ES, remove rod that attaches the ES conversion kit from 

the console legs, and two self tapping screws. Remove 4 pan head 
Phillips screws that attached the electrical box.  On 625ES, loosen 
all four pan head Phillips screws, located at the top of the electrical 
box - two in front, two in back, and remove the cover.  

3. Unplug wires and remove wires from connections: 

 

Remove the back six wires (labeled THERM 1 & 2, PEPI 1 & 2, 
and LIGHT - & + on the board) from the green terminal connect-
or block (A) on the large circuit board with a flat head screw 
driver. 

 

Remove all four screws holding the large circuit board (B). 

 

Locate the three shiny black wires (C) coming from the rocker 
arm and remove the wires from their connections.  One con-
nects to the bottom of the large circuit board and the other two 
to slip on terminals for  - all marked in picture 3.2 with blue 
stickers.   

 

Unscrew the green grounding wire (D) from the inside the box. 

 

Separate the two wires being held by the wire nut (E). 

4. Located under the machine, unscrew two hex head machine screws (F) 

which connects the base stainless steel plate and rocker arm. 

5. Pull the rocker arm assembly with wires out from the electrical box. 

(If necessary, see page 2 Rocker Arm Parts Assembly) 

Rewiring and Reassembling the Unit: 

Reinstall rocker arm assembly in reverse order as on page 1.   

Reconnect the wires (See page 3 for Timer Board close up): 

 

Wire #7 should be matched with wire #7 from fuseholder and wire 
nut together. 

 

Wire #190 terminates to the top slot on front terminal board. 

 

The two high luster wires—one goes to the neutral terminal board in 
back and the other terminates under the large circuit board. 

 

Non-terminal wires should be terminated into the green terminal 
connector block (page 1 A) as follows:   
  - Thin black wire into “THERM 1 & 2” 
  - 22 gauge white wires into “PEPI 1 & 2” 
  - Wires #10 & #15 go into “LIGHT - & +” 

3.2 

3.1 

625ES Shown 

REPLACING ROCKER ARM ASSEMBLY 

Содержание 625ES

Страница 1: ...Revised 2017 READ ALL INSTRUCTIONS CAREFULLY BEFORE OPERATING EQUIPMENT OPERATING SERVICE PARTS MANUAL 625ES ENERGY SMART WRAPPER...

Страница 2: ...E OF CONTENTS Machine Components Electrical Requirements 3 Preliminary Setup 5 Recommended Maintenance 6 Troubleshooting Guide 7 Hot Rod Circuit Board Test 9 Replacing Rocker Arm Assembly 10 Service P...

Страница 3: ...d Non stick cover plate Seal plate damage voids the warranty ENERGY SMART TECHNOLOGY The Energy Smart Wrapper is an innovative system that incorporates an Instant On heating foil with the ability to g...

Страница 4: ...vings of the wrapper it is suggested to use the lowest possible time setting that yields a proper seal using the specific film selected for wrapping GFCI Effective on machines produced after June 2015...

Страница 5: ...7 from end of one bolt and unscrew wing nut 6 then swing top bearing block away 8 to release the axle assembly unscrew removable cap 2 and replace film roll ADJUSTING FOR DIFFERENT WIDTH FILMS Loosen...

Страница 6: ...e seal plate and burn off on the hot plate It s recommended that the Non stick cover be replace every three 3 months or as needed depending on the level of daily wear and tear The Non stick cover shou...

Страница 7: ...sure the GFCI circuit being utilized is not overloaded with other devices If a surface defect is present discontinue use of product and contact Troy Roberts at 800 342 6329 ext 276 or troberts heatsea...

Страница 8: ...S Part 6340 078 107ES Part 6135 038 Rocker Arm Assembly Part 6340 076 Verify the Timer Board is working properly Upon actuation of the Seal Plate the sequence of events should be as follows 1 The Red...

Страница 9: ...he hot rod CHECKING THE THERMISTOR OF THE HOT ROD With the power turned OFF remove the hot rod black wires from Terminals 5 and 6 Using the meter measure the re sistance of the thermistor by connectin...

Страница 10: ...o to slip on terminals for all marked in picture 3 2 with blue stickers Unscrew the green grounding wire D from the inside the box Separate the two wires being held by the wire nut E 4 Located under t...

Страница 11: ...loor model ES 11 Assemble Rocker Arm and Spring K Position the spring under the red rocker arm between base plate M and attach the shoulder bolts L Tighten the shoulder bolts and the BACK OFF HALF TUR...

Страница 12: ...12 Revised 2017 TIMER BOARD ASSEMBLY...

Страница 13: ...eal Plate Kit 3 1 6340 062 Hot Rod Replacement Kit Includes 1 Cutoff Rod TEC100 22 1 2 LG 1 Cutoff Rod Col lar 3 4OD 25 64 ID 1 4 THK 8 32 Hole 1 Set Screw in Hot Rod Collar 1 Split Electrical Bushing...

Страница 14: ...x Screw 1 4 20 x 2 1 2 LG Full Thread 3 1 6135 033 Core Kit Includes 1 3 dia Adjustable Film Core Gray 1 3 dia Fixed Film Core Gray 1 Pin Core Adapter 1 O Ring 1 4 ID 4 1 6340 012 Film Core Axle 5 1 6...

Страница 15: ...ON 1 1 6340 076 Rocker Arm Replacement Kit does not include the seal plate 1 Pivot Bracket 1 Red Indicator Light 1 Snap action Switch 2 Shoulder Bolts 1 Compression Spring 2 Stainless Steel Philips Sc...

Страница 16: ...G W Nema 5 20P Strip 8 8 1 Hot Rod Board Mounting Kit Includes 4 Screw type plastic Stand Offs 9 1 6340 071 Electrical Box Component Kit Includes 2 2 4 blade term Terminal Block 2 Insulated Slip on Te...

Отзывы: