33
Heat & Glo • 6000CMOD-IPI, 8000CMOD-IPI • 2241-900 Rev. K • 4/14
C. Install the Ceiling Firestop
A ceiling
fi
restop
MUST
be used between
fl
oors and attics.
•
DVP pipe only
- Frame an opening 10 in.
by 10 in. (254 mm by 254 mm) whenever
the vent penetrates a ceiling/
fl
oor (see
Figure 8.3).
•
SLP pipe only
- Frame opening 9 in. x 9
in. (229 mm x 229 mm) whenever the vent
penetrates a ceiling/
fl
oor (see Figure 8.3).
• Frame the area with the same sized lumber
as used in ceiling/
fl
oor joist.
• The ceiling
fi
restop may be installed above or
below the ceiling joists when installed with a
attic insulation shield. It must be under joists
between
fl
oors that are not insulated. Refer
to Figure 8.4.
• Secure with three fasteners on each side.
WARNING! Risk of Fire! DO NOT pack insu-
lation around the vent. Insulation must be kept
back from the pipe to prevent overheating.
Figure 8.3 Installing Ceiling Firestop
Figure 8.4 Installing the Attic Shield
INSTALL ATTIC INSULATION SHIELDS
BEFORE OR AFTER INSTALLATION OF VENT SYSTEM
CEILING FIRESTOP
INSTALLED BELOW CEILING
CEILING FIRESTOP
INSTALLED ABOVE CEILING
ATTIC ABOVE
A
PIPE
DVP
SLP
A
10 in. (254 mm)
9 in. (229 mm)
A
D. Install Attic Insulation Shield
WARNING! Fire Risk. DO NOT
allow loose
materials or insulation to touch vent. Hearth
& Home Technologies requires the use of an
attic shield.
The International Fuel Gas Code requires an
attic shield constructed of 26 gauge minimum
steel that extends at least 2 in. (51 mm) above
insulation.
• Attic insulation shields must meet speci
fi
ed
clearances to combustible materials and be
secured in place.
• An attic insulation shield kit is available from
Hearth & Home Technologies. Contact your
dealer to order. Install attic insulation shield
according to instructions included with kit.