2.4 UNIT PLACEMENT
The unit should be mounted to the suitable floor, concrete pads, or structural construction,
following DHT guidelines and applicable architectural and local code requirements to assure the
safe operation of the unit.
NOTES:
1. Proper rigging techniques should be followed while moving heavy equipment.
2. Maintain proper levels in order for the unit to function properly and follow clearance,
dimensional, and applicable drawings.
CAUTION!
Refer to Section 2.5 Piping Installation and Unit Connections for piping and installation
instructions. STP Series units must be installed to permit relief valve drain per local codes.