Revision
0501M077.H
Date
08/08/2012
Heat Electric RadiatorsInstallation and Operating Instructions
INSTALLER PLEASE NOTE:LEAVE INSTALLATION AND OPERATING INSTRUCTIONS WITH CUSTOMER
Страница 1: ...Revision 0501M077 H Date 08 08 2012 Heat Electric Radiators Installation and Operating Instructions INSTALLER PLEASE NOTE LEAVE INSTALLATION AND OPERATING INSTRUCTIONS WITH CUSTOMER...
Страница 2: ...Page 2 Document Heat Electric Operator Revision 0501M077 H Date 08 08 2012 INSTALLATION AND OPERATION...
Страница 3: ...your Controller 13 6 3 Choosing a position in the room 14 6 4 Range Test 14 6 5 Fixing the RFC to the Wall 14 6 6 Reverting your Radiator to Manual Control 15 6 7 Choosing a new ID 15 6 8 Frost Prote...
Страница 4: ...o allow easy heat and time programming a dial temperature setting tamper proof cover and a hidden air sensing thermostat Radio Frequency Control Options The Radio Frequency controllers are an optional...
Страница 5: ...radiator is not possible An LST Low Surface Temperature cover is available to solve this problem The RF controlled radiator is a class I IP44 device and it can be installed in bathrooms zone 2 and 3...
Страница 6: ...y Voltage 230 240VAC 50Hz WARNING THIS APPLIANCE MUST BE EARTHED This radiator must be used on an AC supply only and the voltage marked on the radiator must correspond with the supply voltage Installa...
Страница 7: ...efully stood on one of its cardboard endcaps with the control panel facing down for thirty minutes prior to installation 4 1 Positioning A suitable position for the radiator should be chosen and the p...
Страница 8: ...proximately 50mm above the bottom of the radiator For most efficient operation of the radiator there should be a gap between the skirting board and the rear panel of the radiator to allow air flow beh...
Страница 9: ...tion Hook the radiator lugs on to the tops of the brackets Return the spring loaded part of the bracket B to its original position thereby securing the bottom of the radiator in its final position Cau...
Страница 10: ...wer ON check the supply light is illuminated ORANGE for a short while then either GREEN or RED depending on the ambient temperature of the room This light can be seen on the control panel i Note This...
Страница 11: ...rst time the radiator is switched on you may hear a slight water rushing noise as the pump starts this will only be for a short while and from then on the radiator will operate very quietly 5 4 24 Hou...
Страница 12: ...of the dial Each tappet equates to 15 minutes Set any other required switching times in a similar manner 5 6 Overriding the Timer The manual switch will provide Permanently On Timed Permanently Off co...
Страница 13: ...1 Batteries Your radio frequency controller is supplied with two factory fitted AA size alkaline batteries these should last around two years The low battery symbol appears when it is time to replace...
Страница 14: ...an test the wireless connection Place or hold your RFC in position Press BOOST and ADVANCE together The RFC will transmit a special test signal every 5 seconds causing the radiators supply light to fl...
Страница 15: ...he vicinity has the same code This is very unlikely since there are many thousands of possible codes To make the RFC pick a new random code hold the button on the back of the controller on for 5 secon...
Страница 16: ...9 Cleaning Do not use detergents abrasive cleaners or polish on the radiator as these may damage the finish Wipe the radiator with a dry cloth to remove dust and marks Warning Always disconnect from...
Страница 17: ...a thermometer showing the actual room temperature Target is the temperature you would like It is set manually or by the program and can be when no heating is needed Quick Adjust During normal operatio...
Страница 18: ...n each weekday the target temperature is 21 C from 6 30am to 8 30am then 4 C frost protection until 4 30pm then it is 21 C until 11 00pm and finally 4 C until PROG 1 the next day Press and together fr...
Страница 19: ...30 Stage 1 The program number and day will flash You can change it with and SELECT takes you to stage 2 Stage 2 The time flashes You can adjust it with and SELECT takes you to stage 3 Stage 3 The tem...
Страница 20: ...ION Copy Day Use this to copy all 6 programs from the day you were adjusting to another day Press COPY DAY to actually do the copy CLEAR returns to stage 1 Manual Operation If you clear all 6 programs...
Страница 21: ...ving and reinserting the battery If that does not succeed Time Dayand Program Here you can see the current time and day of the week PROG shows which setting the controller is currently on Power Level...
Страница 22: ...he RFC3 s aerial is aligned with Anthorn The MSF signal is taken off air a few times a year for maintenance purposes so try again later If you cannot get a signal you can always set the clock manually...
Страница 23: ...OG 3 PROG 4 PROG 5 and PROG 6 Once you have adjusted the temperature of PROG 6 press the back button once more to return to normal operation To ensure that the program runs in sequential order you wil...
Страница 24: ...ull power for 1 hour Pressing again will increase the BOOST time by an hour up to 4 hours You will see the remaining minutes counting down on the display screen After the hour or pressing it reverts t...
Страница 25: ...supply to radiator Check radiator is switched on at the mains and on the appliance Check fuse in plug or fused spur Check the supply light is on Temperature of room is higher than the temperature sele...
Страница 26: ...of inadequate packaging or protection If goods are returned without prior written authorisation an administration charge may be raised Carriage is chargeable on all non warranty work and on warranty...
Страница 27: ...Page 27 Document Heat Electric Operator Revision 0501M077 H Date 08 08 2012 Installer Notes...
Страница 28: ...Heat Electric Limited Wainstalls Mill Wainstalls Road Halifax HX7 2TJ Telephone 44 0 1422 231943 Fax 44 0 1422 240018 e mail info heatelectric uk com www heatelectric uk com...