26
DIRECT VENT
INSTALLATIONS
READ AND FOLLOW ALL
INSTRUCTIONS IN THIS SECTION.
FAILURE TO PROPERLY VENT
THIS FURNACE CAN CAUSE
CARBON MONOXIDE POISONING
OR AN EXPLOSION OR FIRE,
RESULTING IN PROPERTY
DAMAGE, PERSONAL INJURY
OR DEATH.
Direct vent installations require a
dedicated combustion air and venting
system. All air for combustion is taken
from the outside atmosphere and all
combustion products are discharged
to the outdoors.
Therefore, no
ventilation or combustion air
openings are required.
IMPORTANT:
The plastic combustion
air and venting components are of
Schedule 40 PVC. If using ABS
piping ensure that the solvent cement
is compatible for joining PVC to ABS
components or use a mechanical
connection that can withstand the
vent temperatures and are corrosion
resistant.
INSTALLATION GUIDELINES
All exhaust piping must be installed in
compliance with Part 7, “Venting of
Equipment,” of the latest edition of the
National Fuel Gas Code NPFA54/
ANSI Z223.1-, local codes or
ordinances and these instructions.
1. Vertical piping is preferred.
2. All horizontal piping must slope
upward a minimum of
1
/
4
inch
per foot of run so that condensate
drains toward the furnace.
3. All horizontal runs must be
supported at least every 4 feet.
No sags or dips are permitted.
4.
IMPORTANT:
Do not common
vent with any other appliance. Do
not install in the same chase or
chimney with a metal or high
temperature plastic pipe from
another gas or fuel-burning
appliance unless the required
minimum clearances to
combustibles are maintained
between the PVC pipe and other
pipes.
5. For horizontal runs where water
may collect, wrap the vent pipe
with self-regulating 3 or 5 watt
heat tape. The heat tape must be
U.L. listed and installed per the
manufacturer’s instructions.
6. The minimum vent pipe length is
5 feet.
Size the exhaust and combustion air
intake pipes as specified in Table 2.
This table lists the maximum allow-
able length in feet of the exhaust and
combustion air intake pipes that may
be used for all furnace inputs as
related to the number of elbows
required and the termination (see
shaded area).
7. The maximum exposed vent
length (above the roof line) is
30
ⴖ
.
!
WARNING
Standard/Concentric
RXGY-D02/RXGY-E03/RXGY-G02
65
60
55
45,000
2”
Alternate
RXGY-D02
55
50
45
Standard/Concentric
RXGY-D02/RXGY-E03/RXGY-G02
40
35
30
2”
Alternate
RXGY-D02
30
25
20
60,000
Standard/Concentric
RXGY-D03/RXGY-E03/RXGY-G02
120
120
120
3”
Alternate
RXGY-D03
110
105
100
Standard/Concentric
RXGY-D02//RXGY-E03/RXGY-G02
30
25
NR
75,000
2”
Alternate
Not Recommended
NR
NR
NR
Standard/Concentric
RXGY-D03/RXGY-E03/RXGY-G02
120
120
120
3”
Alternate
RXGY-D03
100
95
85
Standard/Concentric
RXGY-D03/RXGY-E03/RXGY-G02
110
105
95
90,000
3”
Alternate
RXGY-D03
50
40
35
Standard/Concentric
RXGY-D03/RXGY-E03/RXGY-G02
110
105
95
105,000
3”
Alternate
RXGY-D03
50
40
35
Standard/Concentric
RXGY-D03/RXGY-E03/RXGY-G02
45
35
30
120,000
3”
Alternate
RXGY-D03
45
35
30
Alternate
RXGY-D04
105
95
90
NOTES:
1. N.R. - NOT RECOMMENDED.
2. MAXIMUM OF 6 ELBOWS MAY BE USED. DO NOT COUNT ELBOWS IN ALTERNATE TERMINATION KIT.
MEDIUM OR LONG SWEEP ELBOWS MAY BE USED.
3. A 22
1
⁄
2
OR 45 DEGREE ELBOW IS CONSIDERED ONE ELBOW.
4. CONCENTRIC TERMINATION NO. RXGY-E03 IS FOR THRU-THE-ROOF OR THRU-THE-WALL VENTING.
5. USE KITS RXGY-DO2 (2"), RXGY-G02 (2") OR RXGY-D03 (3") FOR STANDARD OR ALTERNATE
THRU-THE-WALL VENTING.
6. USE KITS RXGY-D04 FOR ALTERNATE VENTING OF 120,000 BTUH UNITS WITH LONG RUNS.
FURNACE
INPUT
PIPE
SIZE
TERMINATION
VENT TERMINATION
KIT RECOMMENDED
(RXGY-D0* Kits for
Horizontal Venting Only)
1 - 2
3 - 4
5 - 6
NUMBER OF ELBOWS
45° or 90°
Medium / Long Radius ONLY
TABLE 2
FOR DIRECT VENT APPLICATIONS - AIR FOR COMBUSTION
PROVIDED FROM OUTDOORS
MAXIMUM ALLOWABLE LENGTH IN FEET OF EACH EXHAUST PIPE AND INTAKE AIR PIPE