
68
BEGIN
¸
1
PARTS REQUIRED:
LOFT PANELS
FINISH
Your loft panels are now installed.
Install loft panels centered over loft joists and ledger board.
Secure with 2" nails spaced 8" apart.
NOTE
: There will be a gap of approximately 1/2" (13 mm) on either side of installed deck panels.
x1
x1
15-7/8" x 23-7/8" (40,3 x 60,6 cm)
23-7/8" x 96" (60,6 x 244 cm)
x30
2" (5,1 cm)
Flush
2"
(5,1 cm)
Nails
8"
(20 cm)
8"
(20 cm)
Flush