
66
FINISH
Your loft joist is now assembled.
1-3/4"
(4,4 cm)
1-3/4"
(4,4 cm)
RL
TP
TP
Flush
Flush
Flush
RL
2
3
4
Assemble joist with 3" nails in a staggered pattern.
Turn assembled joist over and repeat staggered nail pattern.
Support joist and drill a 7/16" hole through each end
(Fig. A)
.
PARTS REQUIRED:
LOFT JOIST ASSEMBLY
x24
3" (7,6 cm)
x2
2 x 4 x 96" (5,1 x 10,2 x 243,8 cm)
TP
2 x 4 x 24" (5,1 x 10,2 x 61 cm)
RL
x2
7/16" (11 mm) Drill Bit
Orient parts
TP
and
RL
on a flat surface.
Hold parts
TP
and
RL
flush and aligned.
BEGIN
¸
1
Fig. A
Flush
3"
(7,6 cm)
Nails