
49
24-3/8"
(61,9 cm)
24"
(60,9 cm)
24"
(60,9 cm)
24"
(60,9 cm)
24-3/8"
(61,9 cm)
2" (5,1 cm) Nails
Install a
23-7/8" x 48"
roof panel flush to the
installed panel and flush at peak
(Fig. B)
.
Secure panel with (1) 2" nail in each corner.
Move the gable end rafter edge until it
is 1/2" from the
23-7/8" x 48"
roof panel
(Fig. A)
.
Finish securing panel with (1) 2" nail in
each corner.
3
4
5
PARTS REQUIRED:
10' x 10' ROOF PANELS
x10
2" (5,1 cm)
Fig. D
Maintain spacing between the center of the rafters
at the lower edge of the panels
(Fig. D)
.
Secure panels with (1) 2" nail into each rafter,
as shown.
Move to the top of the panel and keep spacing
between the center of the rafters.
Secure panels with (1) 2" nail into each rafter.
7/16 x 23-7/8 x 48"
(1,1 x 60,6 x 121,9 cm)
x1
NOTE:
Measurements from inside of gable panels
One 2" Nail
in each
corner
1/2"
(1,2 cm)
Gable
End Rafter
Fig. A
Flush
23-7/8" x 48"
Move Gable
Flush at
peak
Fig. B