
43
96”
(243,8 cm)
96”
(243,8 cm)
Place two rafter-halves
AD
in the corner of back and side walls, flush to panels and studs.
Flush rafters at peak. Secure gusset to rafters with 2" nails following the pattern shown
(FIg. A)
.
Place two rafter-halves
AD
in the corner of back and side walls, flush to panels and studs (STEP - 1).
Flush rafters at peak. Secure gusset to rafters with 2" nails following the pattern shown
(FIg. A)
.
Build (2) rafter assemblies with (1) gusset (Fig. B).
Depending on your shed size, build 4, 6 or 8 rafter assemblies with (2) gussets (Fig. C).
BEGIN
1
2
3
FINISH
Your rafters are now assembled.
RAFTERS
2" (5,1 cm)
PARTS REQUIRED:
x168
x216
x120
x16
x20
x12
x14
x18
x10
6 x 24" (15,2 x 60,9 cm)
10x14'
10x18'
10x10'
x1
2 x 4 x 65" (5,1 x 10,2 x 165,1 cm)
AD
Flip over rafter assembly and fasten second gusset to other side with 2" nails
(FIg. C)
.
Temporary support (OO)
Flush at peak
120"
(304,8 cm)
Fit base of rafters in corners
of back wall.
OO
69" (175,3 cm) Door Stiffener
SET ASIDE THESE TWO RAFTER ASSEMBLIES.
HINT:
Use floor and walls to help
assemble rafters!
Fig. B -
Build 2
Fig. C -
Build 4, 6 or 8
Fig. A
1/4"
(1,9 cm)
1/4"
(1,9 cm)
Temporary Support
Flush
120"
(304,8 cm)
120"
(304,8 cm)