
33
14' EAVE WALL INSTALLATION
3" (7,6 cm)
x3
3" (7,6 cm)
x14
2
BEGIN
Place 1st 14' eave wall centered on floor.
The 1-1/2" (3,8 cm) overlap is to the top.
Use
TJ
as a temporary brace as shown.
Secure
TJ
with (2) 3" screws.
Secure wall with (1) 2" screw into 10' wall
bottom plate
(Fig. A)
and top plate
(Fig. B)
.
Secure wall to bottom plate first.
1
Nail lower edge of panels to floor
with 2" nails spaced 6" apart.
Angle nails into floor frame
(Fig. C)
.
Nail panel to 10' wall stud with
1-1/2" nails spaced 6" apart.
ENSURE PANEL CORNERS ARE FLUSH.
Your 1st 14' eave wall is now installed.
FINISH
2" (5,1 cm)
x32
1-1/2" (3,8 cm)
x13
2" (5,1 cm)
x2
PARTS REQUIRED
2"
(5,1 cm)
Nails
1-1/2"
(3,8 cm)
Nails
Flush
6"
(15,2 cm)
6"
(15,2 cm)
2" (5,1 cm)
Screw
Fig. B
2"
(5,1 cm)
Screw
Fig. A
Secure wall top plate with (1) 3" screw
at the corner at an angle as shown
(Fig. D)
.
3
3"
(7,6 cm)
Screw
Fig. D
3"
(7,6 cm)
Nails
x1
2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm)
TJ
Temporary Brace
TJ
3"
(7,6 cm)
Screws
Nail 2" nails first.
2"
(5,1 cm)
Nails
Fig. C
3"
(7,6 cm)
Nails
OPTIONAL:
DOOR LOCATED
ON 14' EAVE WALL