3
.
SET UP
.
Tools Needed
–5mm Hex Driver, Phillips Screwdriver, Flat-Head Screwdriver (for 597KL height rod mount only)
Materials Included
–4-Hex Head Machine Screws; 1-Phillips Screw (model 597and 599KL, 2 Phillips Screws (model 752KL);
1-Custom Height Rod Attachment Screw, for models 597 and 599; 1 AC adapter holder with 2 sheet-metal screws.
1.
Place batteries in battery holder at base of scale (if
using battery operation – we recommend the use of
EVEREADY Energizer® e2™ batteries).
2.
Feed load cell wire through pillar base.
3.
Insert pillar into pillar base.
4.
Screw in 4 hex screws with (5mm) hex driver.
5.
Plug load cell wire into load cell plug in base of scale
(see diagram 2a). The base of the scale has been
designed to provide wire management for the load
cell cable. See diagram 2b for wire management of
load cell cable.
Diagram 2a
Diagram 2b
6.
Set base upright
7.
Plug load cell wire into load cell plug in display module (correct
plug is labeled load cell)
8.
For models 597KL and models 599KL, place display module on top of
the pillar and use Phillips screw to tighten module to pillar.