Triple-Tiller
08-05-2013
6
Delivery check
Preparation of the machine
Check :
the machine for any damages.
for transport damage to the paint.
hydraulic hoses for cuts and other damage. Check that none of the other hydraulics components
were damages during transport.
that the frame has not been damaged.
that the transport wheels are secure and in good condition.
air pressure level according to technical specifications.
that all wearing points are intact.
that all distance clips for depth adjustment are included.
that all light systems are in working order (if any such system is mounted).
Check the torque:
wheel bolts 386 NM
mounting plate for towing eye
6 pcs bolts 541 NM
Check machine functioning (tractor needed):
raising – lowering – hydraulic unfolding
spindle adjustable levelling discs / levelling tines
spindle adjustable support wheels
rollers / scrapers
Содержание Triple-Tiller
Страница 1: ......
Страница 3: ...Triple Tiller 08 05 2013 3 Trailed kit 3 3 5 m rigid 34 Notes 36 ...
Страница 14: ...Triple Tiller 08 05 2013 14 Harrow tine ...
Страница 16: ...Triple Tiller 08 05 2013 16 Roller bar 3 0 and 3 5 m rigid ...
Страница 18: ...Triple Tiller 08 05 2013 18 Roller 3 0 and 3 5 m rigid ...
Страница 20: ...Triple Tiller 08 05 2013 20 Scraper ...
Страница 22: ...Triple Tiller 08 05 2013 22 Tine track eradicator ...
Страница 24: ...Triple Tiller 08 05 2013 24 Extra equipment Eradicator disc ...
Страница 28: ...Triple Tiller 08 05 2013 28 Trailed kit 3 3 5 m rigid ...
Страница 32: ...Triple Tiller 08 05 2013 32 Support wheels ...
Страница 34: ...Triple Tiller 08 05 2013 34 Hydraulics Trailed kit 3 3 5 m rigid ...
Страница 36: ...Triple Tiller 08 05 2013 36 Notes ...
Страница 37: ...Triple Tiller 08 05 2013 37 ...
Страница 38: ...Triple Tiller 08 05 2013 38 ...
Страница 39: ...Triple Tiller 08 05 2013 39 ...
Страница 40: ...Triple Tiller 08 05 2013 40 ...