UK
Disc-Roller 2,5 - 3,0 – 3,5 - 4,0 m (1-section) 12/08-2014
14
2
1
3
Edge equipment from machine no. 341738
The edge equipment can be adjusted
three places:
1.
Loosen two bolts – move the
arm out/in.
2.
Use the spindle – it raises and
lowers the disc. Loosen two
bolts – raise/lower by the
spindle and retighten the bolts.
3.
Loosen one bolt – tilt the disc
more or less.
New edge equipment for Disc-
Roller.
The disc can be adjusted so that the
excavated soil is collected. Keep the
disc away from the ground to avoid
bending when turning.
Содержание Disc Roller 2,5m
Страница 2: ......
Страница 24: ...UK Disc Roller 2 5 3 0 3 5 4 0 m 1 section 12 08 2014 24 Disc 7 12 13 10 9 6 5 2 3 4 14 1 8 11 13...
Страница 36: ...UK Disc Roller 2 5 3 0 3 5 4 0 m 1 section 12 08 2014 36 Spring Board 2 5m 3 0m 3 5 m...
Страница 37: ...UK Disc Roller 2 5 3 0 3 5 4 0 m 1 section 12 08 2014 37 Spring Board left 4 0m...
Страница 40: ...UK Disc Roller 2 5 3 0 3 5 4 0 m 1 section 12 08 2014 40 El depth stop for disc...
Страница 45: ...UK Disc Roller 2 5 3 0 3 5 4 0 m 1 section 12 08 2014 45 Air brakes...
Страница 57: ...UK Disc Roller 2 5 3 0 3 5 4 0 m 1 section 12 08 2014 57 Diagrams El depth stop...
Страница 58: ...UK Disc Roller 2 5 3 0 3 5 4 0 m 1 section 12 08 2014 58 Lights...
Страница 60: ...The design is subject to modification without notice...