UK
Disc-Roller 2,5 - 3,0 – 3,5 - 4,0 m (1-section) 12/08-2014
11
Put the machine on level ground
and relieve the hydraulics, before
leaving the machine.
Transport
1.
Fold up the edge equipment over the machine.
2.
Lift the discs to the top
3.
Then lift the machine to maximum transport height.
4.
Now the machine is ready for transport.
Uncoupling, Mounted Model
1.
Put down the machine on firm ground and relieve all hydraulic hoses.
2.
Now the machine may be uncoupled.
Uncoupling, Trailed Model
1.
Lift the machine up and tilt the depth stop on the drawbar forward towards
the tractor.
2.
Now lower the machine onto firm ground.
3.
Adjust the drawbar – and wheel cylinder (red) so that the drawing bolt is
loose.
4.
Now the machine may be uncoupled.
5.
Drive the tractor a little forward and then relieve all hydraulic hoses.
Important:
Содержание Disc Roller 2,5m
Страница 2: ......
Страница 24: ...UK Disc Roller 2 5 3 0 3 5 4 0 m 1 section 12 08 2014 24 Disc 7 12 13 10 9 6 5 2 3 4 14 1 8 11 13...
Страница 36: ...UK Disc Roller 2 5 3 0 3 5 4 0 m 1 section 12 08 2014 36 Spring Board 2 5m 3 0m 3 5 m...
Страница 37: ...UK Disc Roller 2 5 3 0 3 5 4 0 m 1 section 12 08 2014 37 Spring Board left 4 0m...
Страница 40: ...UK Disc Roller 2 5 3 0 3 5 4 0 m 1 section 12 08 2014 40 El depth stop for disc...
Страница 45: ...UK Disc Roller 2 5 3 0 3 5 4 0 m 1 section 12 08 2014 45 Air brakes...
Страница 57: ...UK Disc Roller 2 5 3 0 3 5 4 0 m 1 section 12 08 2014 57 Diagrams El depth stop...
Страница 58: ...UK Disc Roller 2 5 3 0 3 5 4 0 m 1 section 12 08 2014 58 Lights...
Страница 60: ...The design is subject to modification without notice...