
7 Cleaning and servicing the heating system – Requirements
94
C
LEANING
THE
FLUE
GAS
PIPE
1.
Switch the heating system off.
✓
See the “HDG Control” operating manual, chapter “5 Using the
control unit”, section “5.3 Switching off the heating system”.
2.
Allow the fire to burn out and cool down.
3.
Turn the main switch off.
8.
Fasten the inspection hatch cover firmly on the flue pipe with the
wing nut.
9.
Re-starting the heating system.
✎
See the “HDG Control” operating manual, chapter “5 Using the
control unit”, section “5.2 Switching on the heating system”.
✓
The cleaning of the flue gas pipe is completed.
Important!
✎
Observe the “Generally applicable safety instructions” in this sec-
tion.
Caution!
Danger of burns from hot surfaces
The surface of the flue pipe becomes very hot during operation.
Even when turned off, it only cools down slowly.
Switch the heating system off and only start with the cleaning and
maintenance work when the surfaces have cooled down.
4.
Unscrew the wing nut (1) on
the inspection hatch lid (2).
5.
Remove the inspection hatch
lid (2) from the flue gas pipe
(3).
6.
Check whether the flue gas
pipe (3) needs cleaning.
7.
If necessary, suction the ash
from the flue gas pipe using a
vacuum cleaner (3).
Figure 7/15 - Cleaning the flue gas pipe
1
2
3
Содержание Compact 25
Страница 1: ...hdg bavaria com HDG Compact 25 35 HDG Compact 45 50 65 HDG Compact 80 Operating manual ...
Страница 2: ......
Страница 6: ...Operation Manual HDG Compact 25 80 Content 6 ...
Страница 107: ......