![HBK Z7A Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/hbk/z7a/z7a_mounting-instructions_2111699010.webp)
Z7A
CONNECTION
8
5
CONNECTION
Load cells with a strain gage measuring system can be connected to:
S
carrier‐frequency measuring amplifiers, or
S
DC measuring amplifiers suitable for strain gage measuring systems.
The load cells are connected using the six‐wire circuit. The wiring assignment is shown in
the following diagram.
(white)
(black)
(grey)
Excitation (+)
(green)
(red)
(Wire strand)
Excitation (-)
Sense (-)
Signal (+)
(blue)
Sense (+)
Signal (-)
Shield,
connected to housing
Electric and magnetic fields often induce interference voltages in the measurement cir
cuit. Therefore:
S
use shielded, low‐capacitance measurement cables only (HBM cables fulfill these
conditions),
S
do not route the measurement cables parallel to power lines and control circuits. If
this is not possible, protect the measurement cable with steel conduit for example.
S
avoid stray fields from transformers, motors and contact switches.
5.1
Parallel connection
Load cells can be wired in parallel by joining the load cell cable core ends of the same
color. In this case, HBM provides junction boxes of the
VKK...
series. The output signal is
then the average of the individual output signals.
Important
Overloading of an individual load cell cannot then be detected from the output signal.
Содержание Z7A
Страница 1: ...Z7A ENGLISH DEUTSCH FRAN AIS Mounting Instructions Montageanleitung Notice de montage...
Страница 3: ...Z7A ENGLISH DEUTSCH FRAN AIS Mounting Instructions...
Страница 18: ...Z7A ACCESSORIES 16...
Страница 19: ...Z7A ENGLISH DEUTSCH FRAN AIS Montageanleitung...
Страница 34: ...Z7A ZUBEH R 16...
Страница 35: ...Z7A ENGLISH DEUTSCH FRAN AIS Notice de montage...
Страница 51: ...17 Z7A ACCESSOIRES...
Страница 52: ...HBK Hottinger Br el Kjaer www hbkworld com info hbkworld com A01847 02 Y00 01 7 0101 0019...