Hayman Reese 03388RW Скачать руководство пользователя страница 1

 

 

TOWBAR 

INSTALLATION INSTRUCTIONS

 

PART NUMBER 

03388RW

 

SUBARU OUTBACK GEN6 CL4

 

 

 

49-75 Pacific Drive Keysborough, VIC 3173 
Phone: 1800 812 017 
Email[email protected]

 

 

 

 

Rev: 

A

 

 

 

 

 

 

 

Page 

1

 

 

 

 

 

          Issue Date: 

01-04-2021

 

 

 

 

PRODUCT DETAILS: 

Part Number: 

03388RW

 

Maximum Towing Braked:   

2000

 

kg 

ECU Number:  

04826

 

Maximum Towing Unbraked:  

750

 

kg 

Tail Harness Length Required: 

1200 mm

 

Maximum Static Ball Load: 

200 

kg 

TBM/Lug Part Number:  

21201

 

Wiring Part Number:  

102096WL

 

 
 

FITTING DETAILS: 

Towbar Installation Time: 

90 Mins.

 

Hayman Reese SmartCODE Solution Required: 

NO 

Wiring Installation Time: 

25 Mins.

 

RPA Disable/Other: 

NO 

Total Installation Time: 

115 Mins.

 

Note: 

Bumper Cut Required: 

Yes 

 

RPA and RAB is disabled via infotainment. 
(To disable you must press and hold the RPA 
and RAB buttons.)
 

 

Instant Stop Start built into the harness must use 
open circuit tail 04943. 

 

Содержание 03388RW

Страница 1: ...0 kg Tail Harness Length Required 1200 mm Maximum Static Ball Load 200 kg TBM Lug Part Number 21201 Wiring Part Number 102096WL FITTING DETAILS Towbar Installation Time 90 Mins Hayman Reese SmartCODE...

Страница 2: ...e bumper front of corner upwards Figure 2 7 Drilling For any required drilling during installation ensure that the area is clear of fuel electrical other components that may be damaged All holes drill...

Страница 3: ...Y 1 SUBARU OUTBACK WELDED ASSY 1 11 TEK SCREW 14 20 HEX HD 22mm 1 2 TRAILER BALL MOUNT 1 12 TOWBALL 50mm 1 3 SIDE ARM RHS ASSY 1 13 D SHACKLE 10mm 2 4 SIDE ARM LHS ASSY 1 14 SMART PIN GOLD 1 5 BOLT HE...

Страница 4: ...one 1800 812 017 Email info haymanreese com au Rev A Page 4 Issue Date 01 04 2021 1 Disconnect negative battery terminal 1 2 Open the rear tailgate Remove 2x scrivet clips Remove the plastic cover Rep...

Страница 5: ...017 Email info haymanreese com au Rev A Page 5 Issue Date 01 04 2021 4 Remove 2x scrivet clips and 3x screws Repeat for the other side 5 Remove 2x scrivet clips on bottom edge Remove mudflap assembly...

Страница 6: ...812 017 Email info haymanreese com au Rev A Page 6 Issue Date 01 04 2021 7 Remove 2x bolts from the exhaust muffler Slide 2x muffler isolators off the hook mounts Remove the muffler 8 Remove 4x screw...

Страница 7: ...the LHS Disconnect the key transmitter connector Remove 4x bolts and 2x nuts from the impact beam Remove the key transmitter and discard the impact beam 11 Insert the side arm into the chassis and loo...

Страница 8: ...ail info haymanreese com au Rev A Page 8 Issue Date 01 04 2021 13 Fit the key transmitter bracket and secure with a Tek screw 14 Place masking tape on the bumper outer skin Mark and cut out an area 16...

Страница 9: ...Page 9 Issue Date 01 04 2021 16 Remove the grommet Feed the tail harness connector through the hole 17 Slide the grommet to desired length from the socket Secure the harness with supplied cable ties a...

Страница 10: ...he trailer patch harness 102096 WL into the 10 way connector 23 Using the supplied alcohol wipe clean the sheet metal area and underside of the ECU 24 Connect the trailer patch 12 way connector to the...

Страница 11: ...tive battery terminal 30 Refit all previously removed parts from step 2 to 10 and the step 18 to 20 in the reverse order 31 Test the trailer patch function using a light board 32 To disable the RPA an...

Страница 12: ...class fasteners Inspection should be requested to coincide with vehicle major services 3 It is the owner s responsibility to ensure towing and down ball weight capacities of the towing vehicle are not...

Страница 13: ...d and tensioned Replacement parts are available from your Hayman Reese Distributor TOWBALL MOUNT REMOVAL INSTALLATION STEP 1 Insert Trailer Ball Mount TBM a into towbar hitchbox b aligning hole in TBM...

Отзывы: