![hawo hd 650 DC EcoPak Скачать руководство пользователя страница 27](http://html.mh-extra.com/html/hawo/hd-650-dc-ecopak/hd-650-dc-ecopak_operating-instructions-manual_2109931027.webp)
hd 650DC EcoPak
D
Chapter 3
9.693.024
Page 27
V 1.02
3.9
Sealing seam test
– “Seal Check”
Test the critical process parameters (temperature, contact pressure and sealing time) with
"SEAL CHECK".
Seal Check seal indicators are not suitable for packaging with side folds.
This test should be performed before and after the daily working process and/or
before/after each batch and can be documented by routine filing of the print-out.
Additional use of the SEAL CHECK sealing indicator in combination with the SEAL CHECK
function of the sealing device is recommended.
Before the test, the sealing device must be ready for use and the set temperature must have
been reached.
Sealing machine is ready
for operation
Preset nominal temperature
is reached
Press the button
Insert sterilisation package,
width min. 200mm and,
if necessary, insert SEAL
CHECK indicator strips
Date Temperature Device number
Time Personnel identification
Содержание hd 650 DC EcoPak
Страница 44: ...hd 650DC EcoPak D Chapter 6 9 693 024 Page 44 V 1 02 6 Declaration of conformity ...
Страница 45: ...hd 650DC EcoPak D Chapter 6 9 693 024 Page 45 V 1 02 ...
Страница 46: ...hd 650DC EcoPak D Chapter 6 9 693 024 Page 46 V 1 02 ...
Страница 47: ...hd 650DC EcoPak D Chapter 6 9 693 024 Page 47 V 1 02 ...
Страница 49: ......