background image

H:\KwKit\KK-RLL-INST-4-05.doc 

 

 

INSTALLATION INSTRUCTIONS KK-RLL 

ROOF MOUNTED LOAD LIGHT 

 

 
 
TOOLS REQUIRED: 

Power drill 
Caulk gun with silicone 
3/8” drill bit 

Safety goggles 
Wrench set 

 
 
HARDWARE SUPPLIED: 

Work Light with Double Lamp 

HE-90600B 

5/16 -18 x 1” Stainless Hex Head Bolt 

GSM34010 

5/16-18 Nylock Nut 

GSM30017 

5/16” x 1 ½” Fender Washer  

GSM31019 

3/8” Plastic Grommet 

GSM20003 

Light mounting Bracket  

PRM97310 

 

INSTALLATION INSTRUCTIONS: 

 

Note:  Mounting and wiring must be done prior to prisoner compartment installation. 

 

1. 

Bolt light fixture to the mounting bracket.  (End with 2” flange and one hole).  
Overall bracket size is 10 ½” long by 2” wide. 

 

2. 

Position load light bracket in desired location on roof: Recommended location is 
to center light above door opening on side or rear of van.  If there is a third brake 
light, position the work light over the third brake light not on top of light. 

 

3. 

Mark and drill three (3) 3/8” diameter holes.  Bolt the bracket assembly on with 
two (2) stainless steel 5/16-18 x 1” bolts, nuts and fender washers. 

 

4. 

The 3

rd

 3/8” diameter hole is for the wire. Wire goes through the roof and the 

bracket.  Insert 3/8” plastic grommet in the hole from inside van going outside.  
Run wire through the bracket and grommet.  Silicone the hole.   

 

5. 

Follow the attached wiring diagram for the standard 3-way switching included in 
kit.  This gives the option of turning light on from the cab of the vehicle or the 
rear or side doors. 

 

Note:  See attached wiring diagram. 

 
 

Note: If desired, light can be activated with a single pole single throw switch in the dash.

Отзывы: