INSTALLATION INSTRUCTIONS KK-K9-D14-K
K-9 TRANSPORTATION SYSTEM
1997-2003 DODGE DURANGO
TOOLS REQUIRED:
Power Drill
Standard And Metric Socket Sets
6” Extension
7/16” Wrench
Drill Bits – 1/8” Through 3/8”
Phillips Screwdriver
Wire Cutters and Crimping Tool
Ratcheting Wrench
HARDWARE: (some hardware included in assembly)
QTY:
DESCRIPTION:
PART #:
10
#10 X ½” Stainless Phillips Flat Head Screw
GSM34150
70
1/4-20 X ½” Stainless Carriage Bolt
GSM32022
96
1/4-20 Serrated Nut
GSM30023
30
#10 X 1/2 Stainless Phillips Screw
GSM34169
15
#10 X 3/4 Stainless Phillips Screw
GSM34170
26
1/4-20 X ¾” Stainless Carriage Bolt
GSM32024
24
#12 X ¾” Stainless Phillips Screw
GSM34177
6
¼” X 1 ¼” Hex Head Lag bolt
GSM33061
2
3/8” X 1 ½” Hex Head Bolt
GSM33030
2
3/8” Flat Washer
GSM31007
2
3/8” Lock Washer
GSM31028
2
3/8” Hex Nut
GSM30008
4
3/8” X ½” Flat Washer
GSM31021
4
Rubber
Feet
PRM97609
4
8-32 Keps Nut
GSM30027
4
8-32 X 1” Pem Stud
GSM32252
4
8-32 X 1” Phillips Machine Screws
GSM33112
1
Tube of Silver Silicone
PRM97343
COMPONENTS:
1
K-9 Main Housing
1
Dome Light Kit
1 Rubber
Mat
1
Front Mounting Adjustable Legs
1
Set Of Tunnel Assemblies
1
Set Of Hinged Window Guards
1
Set Of Aluminum Door Panels
1
Rubber Edge Molding
SUB ASSEMBLIES:
•
Attach dome light with wire to housing ceiling.
•
Install rubber edge molding on edges of tunnels