8
7 of 13
Tightening Arcorail Base to Frame
Ensure all parts are attached firmly (to simulate one solid part) and install in numeric
order as shown.
5
6
7
4
2
4
5
3
(Secure but do not over-tighten this bolt)
(Tighten the
front bolt)
(Tighten the bolt)
(Tighten
the bolt)
(Secure but do not over-tighten this bolt)
1
Insert handle into
post.
A
Test that handle will
rotate and lock into position
by lifting it and rotating it to
the four locking positions.
A
Insert the height adjusting
screw into the post
and tighten securely.
I
ball-pin
.
7 of 13
Tightening Arcorail Base to Frame
Ensure all parts are attached firmly (to simulate one solid part) and install in numeric
order as shown.
5
6
7
4
2
4
5
3
(Secure but do not over-tighten this bolt)
(Tighten the
front bolt)
(Tighten the bolt)
(Tighten
the bolt)
(Secure but do not over-tighten this bolt)
1
Insert handle into
post.
A
Test that handle will
rotate and lock into position
by lifting it and rotating it to
the four locking positions.
A
Insert the height adjusting
screw into the post
and tighten securely.
I
ball-pin
.
o