
ASSEMBLY INSTRUCTIONS
i
i
*Goal and Net sold separately
2 people are recommended for this assembly
Estimated 45 minutes assembly time per goal (not including time for concrete)
INS849
Revision 0
06/07/2016
FBL-849
Stadium Pro Freehanging Net Supports - 2 Post
45
mins
IMPORTANT:
Please read these assembly instructions carefully before
starting to assemble your Freehanging Net Supports
IMPORTANT:
must
The sockets
be installed in a minimum of 0.6m of
concrete. Consult a construction engineer for advice where required
3