0
Produced by: Zwembad BVBA Industrieweg 9 3190 Boortmeerbeek Belgium www.harmopool.eu
Manual solar douche 20 liter
Страница 1: ...0 Produced by Zwembad BVBA Industrieweg 9 3190 Boortmeerbeek Belgium www harmopool eu Manual solar douche 20 liter ...
Страница 2: ...he production of this product its quality was the most important aspect It is highly recommended to read the manual beforehand in order to expedite the installation When questions arise please contact your supplier or visit our website for more information www harmopool eu ...
Страница 3: ...ct the hose to the inlet of the shower and connect it to the water supply afterwards First start up 1 Turn the valve on and put it on hot red Note By filling the pipe whilst the valve is hot will ensure that there will be no air left This procedure is only necessary during the installation 2 Turn the water supply on It will take approximately 2 minutes to will the shower 3 When the water starts to...
Страница 4: ...n for 4 5 minutes until the pipe is empty Note Do not change the setting of the valve This prevent the pipe from going empty 3 Place the shower inside on a warm and dry location during the winter Warnings 1 DO NOT USE SALT WATER OR ANTI FROST PRODUCTS 2 RECOMMENDED WATER PRESSURE 3 5 BAR 3 START THE SHOWER IN THE COLD POSITION BLUE TO PREVENT BURNS ...