8 - Technical specifications
8.8
1a
5
S1+
S1+
1b
6
S1-
S1-
1c
26
End nozzle L
End nozzle L
2a
7
S2+
S2+
2b
8
S2-
S2-
2c
25
End nozzle R
End nozzle R
3a
9
S3+
S3+
3b
10
S3-
S3-
3c
29
+12V sensor
+12V sensor
4a
11
S4+
S4+
4b
12
S4-
S4-
4c
4
GND1
PWM 1TX
5a
14
S5+
S5+
5b
15
S5-
S5-
5c
27
GND2
GND
6a
16
S6+
S6+
6b
17
S6-
S6-
6c
13
GND3
Optional 5 Reg. feedback
7a
18
S7+
S7+
7b
19
S7-
S7-
7c
33
Option1 4-20mA
Option 1 4-20mA
8a
37
3-pos 1a
S8+
8b
36
3-pos 1b
S8-
8c
32
Option2 Frq
Option 2 Frq
9a
35
3-pos 2a
S9+/Air angle 0-5V
9b
34
3-pos 2b
S9-/Fan speed 0-5V
9c
not connected
(Option3)
Option 3/Tank gauge
10a
21
On/off+
On/off+
10b
22
On/off-
On/off-
10c
not connected
(Option4)
PWM Output option
11a
23
P
P
11b
24
Pressure-
Pressure-
11c
28
Flow
Flow
12a
20
FM up
Foam blop 0-5V
12b
1
FM dn
option 4 Rx
12c
31
Speed
Speed
13a
3
FM L
FM L
13b
2
FM R
FM R
13c
30
Gnd sensor
Gnd sensor
39-pole
37-pole
SPRAY
SPRAY II
39 or 37 poled plug with cable.
Electrical connections for SPRAY and SPRAY II
Содержание COMMANDER TWIN FORCE 3200
Страница 1: ...COMMANDER TWIN FORCE www hardi international com 67000200 Version 1 03 GB 06 2007 Instruction book ...
Страница 8: ...Table of contents TOC 6 ...
Страница 10: ...1 CE Declaration 1 2 ...
Страница 14: ...2 Safety notes 2 4 ...
Страница 66: ...6 Maintenance 6 2 Boom lubrication oiling plan 32 36 m ...
Страница 67: ...6 Maintenance 6 3 Trailer lubrication oiling plan ...
Страница 107: ...8 Technical specifications 8 11 Charts Boom hydraulic Y Boom hydraulic Z ...
Страница 108: ...8 Technical specifications 8 12 Sprayer hydraulic Fan transmission ...
Страница 109: ...8 Technical specifications 8 13 Electrical specifications for boom and work light ...
Страница 110: ...8 Technical specifications 8 14 ...