ASSEMBLY INSTRUCTIONS (Continued)
FAN ALIGNMENT AND HANGER BRACKET INSTALLATION
WARNING
To avoid possible electrical shock, be
sure electicity is turned off at the main
fuse box before hanging.
NOTE: If you are not sure if the outlet box is
grounded, contact a licensed electrician for
advice, as it must be grounded for safe operaion.
5. Reinstall the hanger ball on the downrod as
follows. Route the three 54 in. wires through
the hanger ball. Position the pin through
the two holes in the downrod and align the
hanger ball so the pin is captured in the
groove in the top of the hanger ball. Pull the
hanger ball up tight against the pin. Securely
tighten the set screw in the hanger ball.
(Fig. 5)
5
CAUTION
A loose set screw could result in a wobbly
fan.
D
6. Cut off excess lead wire approximately 6 to 9
in. above top of the top of the downrod. Strip
insulation off 1/2 in. from the end of each lead
wire. (Fig. 6)
6
6
to
9
in
.
9