
42
A
A
B
C
B
Rescue Procedure
This section provides a description of the procedure to be followed and the controllers to be used when you
encounter a problem (a fault occurring on the AWP or an operator trapped in the basket) during operation of the AWP.
This procedure should be read and fully understood by the operator (and anyone carrying out the work around the
machine) during the management of the machine and at regular intervals thereafter.
The user being physically ill
If the user is ill or unable to operate the machine, the person on the ground can take control of the aerial work
platform via the ground console. Observe the following instructions:
-Turn the key on the ground console to position C in Figure A to take control of the aerial work platform.
-Lower the aerial work platform.
Encountering an accident or a fault
Evacuate all personnel from the basket.
A manual system is reserved for operating the machine in the event of an accident or a fault that prevents manual
operation of the console.
-Open the hood at the right side of the turntable.
-To make move the AWP, operate the electromagnetic valve corresponding to that movement as follows.
Beware of any structures or obstacles below the
aerial work platform.
Содержание GTHZ120
Страница 2: ...2 ...
Страница 5: ...2 Ⅰ Overview ...
Страница 15: ...12 II Description ...
Страница 16: ...13 ...
Страница 17: ...14 Dimensions GTHZ120 ...
Страница 18: ...15 GTHZ120 ...
Страница 19: ...16 GTHZ17 0 ...
Страница 20: ...17 GTHZ170 ...
Страница 21: ...18 GTHZ170 C ...
Страница 22: ...19 GTHZ170C ...
Страница 28: ...25 1 10 2 3 9 8 7 6 5 4 11 13 12 14 16 15 17 Control and Command Instruments A Ground Control Panel ...
Страница 43: ...40 GTHZ120 The corresponding functions of the electromagnetic valves are as follows ...
Страница 47: ...44 GTHZ120 GTHZ170 170C ...
Страница 48: ...45 ...