81
Operation instruction
1.Machine turn-on
Pay attention to the safty instruction in chapter 6;
First operation must under professional techinical engineers’ guidence.
Use E-stop when meeting urgent issue, to protect the machine.
Connect the main power cable
Turn on the main air switch
Start the PC
Turn off the E-stop and turn on the start button for machine self checking.
Check the negative pressure setting on the GUI
Loading material and turn on the suction
Turn on the LED lamp
Button position refer to the machine drawing pictures
Refer the alarm system information
Содержание HT3200-UV K Series
Страница 1: ...3200 Hybrid UV printer installation instruction HT3200 UV_K...
Страница 16: ...15...
Страница 39: ...38 Select the communication port Select the printer model...
Страница 40: ...39 Select lamp type Browse a path for TopJet...
Страница 42: ...41 Install Click finish to continue...
Страница 43: ...42 Install the driver for PCIE card...
Страница 44: ...43 Accept and click next Continue...
Страница 45: ...44 Finish Normally we do not have to reboot computer after installation 5 2 Topjet software operation guide...
Страница 50: ...49...
Страница 59: ...58 5 2 6 Heads parameter Setting...
Страница 63: ...62 Finish assembly of tube as shown in picture below Left is the outlet tube right is the inlet tube...
Страница 64: ...63 Clean all tubes with flush Connect the tubes with the heads As shown in pictures below...
Страница 65: ...64 Remove the screws on the plate one is at the back side one is at the front side Remove the protective film...
Страница 66: ...65 Put the head to the right position Discharge the protective fluid of the head...
Страница 75: ...74 Modify the page header base point based on the margin...
Страница 110: ...109 Cable diagram of HT3200D head configuration 2X5 Mode DA_YMCKKCMYWW Mode DA_YMCKKCMY_...
Страница 111: ...110 Mode DA_CMYKW Mode DA_ _CMYKW...
Страница 112: ...111 Mode DA_YMCKKCMYWW Mode DS_CMYK...
Страница 113: ...112...