2.Pre-installation
1. Prepare the working field under previous instruction.
2. Install distribution box under previous instruction, prepare a 15KVA voltage
regulator.
3. Prepare 2 pcs of monkey wrench, 1 pcs of spirit level, 6L of coolant(pure water or
anti-freeze fluid) for the LED lamp chiller.
4. Arrange a forklift for at least 8T(with extension arms) before the equipment
arrives. If it needs to be unload from the container or hoisted to buildings, a crane
will also be needed. Make sure the passage clear for the machine.
Three phase 360-420V
,
50~60Hz
Содержание HT3200-UV K Series
Страница 1: ...3200 Hybrid UV printer installation instruction HT3200 UV_K...
Страница 16: ...15...
Страница 39: ...38 Select the communication port Select the printer model...
Страница 40: ...39 Select lamp type Browse a path for TopJet...
Страница 42: ...41 Install Click finish to continue...
Страница 43: ...42 Install the driver for PCIE card...
Страница 44: ...43 Accept and click next Continue...
Страница 45: ...44 Finish Normally we do not have to reboot computer after installation 5 2 Topjet software operation guide...
Страница 50: ...49...
Страница 59: ...58 5 2 6 Heads parameter Setting...
Страница 63: ...62 Finish assembly of tube as shown in picture below Left is the outlet tube right is the inlet tube...
Страница 64: ...63 Clean all tubes with flush Connect the tubes with the heads As shown in pictures below...
Страница 65: ...64 Remove the screws on the plate one is at the back side one is at the front side Remove the protective film...
Страница 66: ...65 Put the head to the right position Discharge the protective fluid of the head...
Страница 75: ...74 Modify the page header base point based on the margin...
Страница 110: ...109 Cable diagram of HT3200D head configuration 2X5 Mode DA_YMCKKCMYWW Mode DA_YMCKKCMY_...
Страница 111: ...110 Mode DA_CMYKW Mode DA_ _CMYKW...
Страница 112: ...111 Mode DA_YMCKKCMYWW Mode DS_CMYK...
Страница 113: ...112...