Figure 6.4 Control logic diagram of the start-stop
1. Time Zone 1-4: Actuator (IGV1 & IGV2), Hot Gas Bypass Valve (HGBP), and Medium Pressure
Valve Self-test time zone require self-test procedure prior to each startup to prevent abnormal
shut down or valve un-recovery failure.
2. Time zone 4-5: oil pump pre-open time 3 seconds; Actuator IGV2 pre-open to IGV1 = 10% of
the corresponding position.
3. Time Zone 5-6: Number of seconds during compressor start-up process
Note1
:
Time Table 6 Compressor Startup Completion Point, Actuator (IGV1) will immediately
open to 10% position.
4. Time zone 6-7-8: The unit is free to load and unload according to the capacity control logic.
5. Time Zone 8-9: Time point 8 the shutdown command is issued and the heater bypass valve hits
to fully open position.
6. Time Zone 9-10: The Actuator (IGV1) is still unloaded according to the safety margin equation;
the medium pressure valve begins to close to fully close position.
Note2
:
When the pressure ratio is high, IGV1 may not close to 10% position
Note3
:
After the heater bypass valve is fully open, it will start to count about 20 ~ 30seconds. If
the IGV1 still cannot be closed to 10% when the time is up, the compressor will need to
be stopped (shutdown)
7. Time Zone 10-11: Pump Delay 3seconds shutdown area
8. Time Zone 11-12: Lower the Actuator (IGV1) opening to 5% while IGV2 is closed to 5% position
3S
3S
1 2 3 4 5
5%
7
10%
10%
6
8
9
10 11 12
5%
5%
5%
IGV2
20S
IGV1
5%
5%
Oil Pump
Compressor
HGBP
Mid-pressure
proportional
valve
Procedure
Procedure
Procedure
Procedure of start
of start
of start
of start
Procedure of stop
Procedure of stop
Procedure of stop
Procedure of stop