6. POST-COMMISSIONING CHECK
6.1. Condensate removal
Check that the removal of condensates is not obstructed, on both the boiler
side and the pipe side
6.2. Gas supply
Check that the gas pipe diameter is correctly sized:
It is necessary to stop all the boilers together abruptly using the boiler room
main circuit breaker to check that the gas pressure regulator safety device is
not triggered.
If this is triggered, the gas pipe is undersized. After this operation, reengage
the circuit breaker. The boilers must start automatically, if not, consult the
supplier of the gas pressure regulator.
6.3. Full power cuts
We draw your attention to the fact that when the burner shuts down at
maximum power, a noise phenomenon accompanied by vibrations may
occur.
In the event of a maximum power cut detection on your installation, be sure
to remove them quickly by checking your installation, including the settings
of the boiler regulation, and if present, of the controller controlling the boiler
room.
Содержание VARMAX 120
Страница 11: ...14 09 2020 11 156 VARMAX Installation Use and Maintenance ...
Страница 44: ...44 156 00BNO9168 I U0606551 VARMAX Installation Use and Maintenance figure 33 Electrical wiring diagram ...
Страница 125: ...14 09 2020 125 156 VARMAX Installation Use and Maintenance ...
Страница 155: ...14 09 2020 155 156 VARMAX Installation Use and Maintenance ...