VARMAX -
Installation, Use and Maintenance
figure 10 -
Removing side panels
U0501963-A
handle
4.7.
Removing / refitting side panels
Open the casing doors.
Remove the locking screw accessible via the
inside of the boiler.
* For models 120 to 320 kW.
Use the handle in the centre of the panel for this.
Lift up the panel vertically and remove.
When refitting, re-fasten the locking screws from
inside the boiler after fitting the panels.
Note: It may be necessary to remove the rear side
panels in order to fit through doors. To do
this, unscrew the fixing screws which hold the
panel onto the boiler's structure and remove
the panel.
4.8.
Removing / refitting the top panel
figure 11 -
Removing the upper panel
locking
screw*
rear side panel
U0502250-#
removable part
Open the casing doors.
Loosen the 2 thumbscrews on the top of the boiler
(1 or 2 turns will be enough. It is not necessary
or recommended to unscrew them completely).
Slightly lift up the panel and remove it from the
front.
To refit it, follow the procedure in reverse.
Open the casing doors.
Remove the ground wire located on the front left
of the panels. ( et )
Pull the first panel forward and lift it up to remove
it. Do the same for the second panel.
To refit it, follow the procedure in reverse.
figure 12 - Disassembly of upper panels
removable parts
Models 525 and 600 :
1
2
1
2
00U06609560-A
Models 120 to 450 :
Содержание VARMAX 120
Страница 11: ...14 09 2020 11 156 VARMAX Installation Use and Maintenance ...
Страница 44: ...44 156 00BNO9168 I U0606551 VARMAX Installation Use and Maintenance figure 33 Electrical wiring diagram ...
Страница 125: ...14 09 2020 125 156 VARMAX Installation Use and Maintenance ...
Страница 155: ...14 09 2020 155 156 VARMAX Installation Use and Maintenance ...